Portfolios Display

commercial-industrial-contractors

 


Heide St. Warehouse Refurb

Project Location

    – Troy Michigan

Project Overview

    – 6,500 sq ft of rusty ceiling
    – 6,000 sq ft of masonry walls
    – 6,500 sq ft of polished concrete
    – 4,500 sq ft of office walls
    – 3,200 sq ft of drop ceiling repaint

1 Troy Refurb (8) 71e8625842
Troy Refurb (2) D0cd40a69b
Troy Refurb (3) 321bd7f537
Troy Refurb (4) 74c1a666a1
Troy Refurb (5) 6beb98dfea
Troy Refurb (6) 29789ab572
Troy Refurb (7) 43dc0300ef
Troy Refurb Ca34c457e1

Project Details

Oil contamination on ceiling was not present and we’re able to save the client some money by blowing off all dry dusty contamination. Sherwin Williams rust inhibiting primer was put down on 100% of surface. Sherwin Williams egg shell dryfall was used for top coat.

Walls were cleaned, caulked and some bare masonry primer was put on a few spots. All surface mounted items had bonding primer applied before top coating to help hide those items into wall color.

Client requested Ferrari red on Main structural beam in warehouse and double swing steel doors. We used Sherwin Williams Sher-cryl with outstanding results.

Client was looking for a easy to clean floor with no maintenance. We provided an 800grit polished concrete floor which will provide the least amount of expense on a projected 20yr cycle.

Office walls and drop ceilings were repainted using Sherwin Williams Duration Home on walls and pro mar 400 flat on ceilings.


Next-Project

Ask an Expert

Call us @ (517) 639-1464
or fill out our online form today.

We Can Help

Online Quote

Use our online quote system and a project manager will be in touch.

Quote

Uniguard Warranty

See how your roofing investment can be protected.

Learn More